一二三四在线观看免费视频-成人免费无码大片a毛片软件-国产又色又爽又黄刺激视频-久久久久88色偷偷

Technical document

Injection molding process of ABS material

2024-01-07 21:31:37 Injection molding process

ABS (acrylonitrile-butadiene-styrene copolymer) is a common thermoplastic polymer that is widely used in injection molding to produce a variety of plastic parts and products. ABS plastics are known for their good mechanical properties, comprehensive 

stability and ease of processing. Here are some key steps and considerations for the injection molding process of ABS materials:

Equipment selection: Because ABS has good fluidity, it is suitable for using standard injection molding machine for processing. Machine selection should consider the size of the product, wall thickness and injection volume.

Drying: ABS materials must be dried before processing to remove moisture from the material. The general recommended drying conditions are to dry ABS particles in an environment of 80-85°C for 2-4 hours.

injection mould

Melt temperature: The melt temperature range of ABS is usually 210°C to 280°C, and the specific temperature needs to be 

adjusted according to the characteristics of the material and product design. Too high a temperature may cause material 

degradation, while too low a temperature may affect fluidity and product quality.

Mold temperature: The temperature of the mold is usually controlled between 40°C and 80°C to ensure a good product surface finish and reduce internal stress. Mold design and cooling system can also affect this parameter.

Injection pressure: The appropriate injection pressure should be determined according to the design characteristics of the product. In general, the injection pressure of ABS material can range from 50MPa to 100MPa. An inadequate pressure setting may result in inadequate melt filling, while too high a pressure may cause back expansion or warping.

Pressure holding stage: Pressure holding is a stage after injection to ensure that sufficient pressure can be maintained in the cavity to supplement the shrinkage of the melt during the mold cooling and curing process. The setting of the holding time and pressure directly affects the dimensional stability and surface quality of the product.

Cooling time: Sufficient cooling time contributes to full curing and dimensional stability of the product. The length of time depends on a variety of factors, including wall thickness, mold temperature, and product design.

Screw back pressure: Proper screw back pressure can help improve the quality and mixing effect of the melt, while avoiding air mixing. But too high back pressure will increase the wear and energy consumption of the machine.

Stripping and post-treatment: The finished product needs to be removed from the mold, which may require an appropriate stripping mechanism. Some products may also require post-processing steps such as deburring, painting, or coating.

Note that the above parameters may be adjusted according to the specific machine, material, product design and processing environment. Experienced injection molding engineers usually fine-tune according to the actual situation to ensure product quality. When performing ABS injection molding, it is important to follow the specific instructions and data sheets provided by the material supplier, as well as safety procedures and operating guidelines.

injection mould


Home
Product
News
Contact
主站蜘蛛池模板: 伊人情人色综合网站| 亚洲乱码中文字幕综合| 亚洲熟女精品中文字幕| 色一情一乱一伦一区二区三区日本| 日本熟妇浓毛hdsex| 消息称老熟妇乱视频一区二区| 亚洲av永久无码精品网址| 精品人妻va出轨中文字幕| 国产精品人成在线播放新网站 | 成人综合伊人五月婷久久| 九九视频在线观看视频6| 国产精品无码专区| 无码内射成人免费喷射| 久久自己只精产国品| 人妻少妇av中文字幕乱码| 国产18禁黄网站免费观看| 乱人伦人妻精品一区二区| 日韩一区二区在线观看视频 | 成人免费无码大片a毛片抽搐色欲 天堂а√中文最新版地址在线 | 国产日韩欧美不卡在线二区| 最新国自产拍av| 暖暖在线观看免费高清完整版| 欧美人与动牲交zooz| 小13箩利洗澡无码免费视频| 国产精品久久久国产盗摄| 粗了大了 整进去好爽视频| 国产精品无码无卡在线观看久| 国语free性xxxxxhd| 狠狠躁夜夜躁人人爽天天不卡| 国产成人精品久久亚洲高清不卡 | 久久天堂av综合合色| 业余 自由 性别 成熟视频 视频| 国产亚洲色视频在线| 中文字幕一区二区三区精彩视频| 粗一硬一长一进一爽一a级| 人人摸人人搞人人透| 人人妻人人澡人人爽欧美一区| 玩肥熟老妇bbw视频| 国产三级精品三级男人的天堂| 久久久久久国产精品免费无码| 日产精品一二三区|